Young-Davidson is our flagship operation and one of Canada’s largest underground gold mines. With growing production, declining costs and a large Mineral Reserve base, Young-Davidson will serve as Alamos’ foundation for growth for many years to come.

2019 Results

Production

oz Au (thousands)

188

Total cash cost1

US$/oz

$800

Mine-Site All-in Sustaining Costs1

US$/oz

$1,047

1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.

Mineral Reserves and Resources

as of December 31, 20192

Proven and Probable
Mineral Reserves

000 oz Au

3,146

Measured and Indicated
Mineral Resources

000 oz Au

1,197

Inferred
Mineral Resources

000 oz Au

105

2 M&I Mineral Resources exclusive of Mineral Reserves. Please see 2019 year end Mineral Reserves and Resources statement for additional detail.

Young Davidson Mine Map Larger

The Young-Davidson gold mine is located near the town of Matachewan, approximately 60 kilometres west of Kirkland Lake in Northern Ontario, within the Abitibi Greenstone Belt. Young-Davidson is centrally located between Timmins, Kirkland Lake, North Bay and Sudbury, Ontario – a region well-known for servicing the global mining industry.

Luc Guimond, General Manager, Young-Davidson mine Luc Guimond
General Manager
Matachewan, Ontario Canada

Young-Davidson is a large, low-cost, bulk tonnage underground mine located in Northern Ontario. The Young-Davidson property consists of contiguous mineral leases and claims totaling approximately 11,700 acres. With a large Mineral Reserve base, Young-Davidson is a long-life operation with significant Mineral Resources and exploration potential to support mine life extension.

The operation has been undergoing a multi-year expansion which is expected to be completed in July 2020. The completion of this lower mine expansion is expected to drive production higher and operating costs lower through a number of productivity improvements. Combined with declining capital spending, this is expected to drive strong free cash flow growth in the years ahead.

Gold was originally discovered at Young-Davidson in 1916 and underground production began in 1934. Over the next 23 years, one million ounces of gold were produced from the Young-Davidson and nearby MCM Mine properties. The mine lay dormant between 1957 and 2005, when Northgate Minerals merged with Young-Davidson Mines Limited and began a surface exploration program and ultimately started construction of the operation. In 2011, AuRico Gold acquired Northgate Minerals and commenced open pit mining operations at Young-Davidson. First gold was poured in April 2012 and by October 31, 2013, the underground mine achieved commercial production. AuRico Gold merged with Alamos Gold in 2015.

Young-Davidson is situated within the southwestern part (Larder Lake-Cadillac Fault Zone) of the Abitibi Greenstone Belt, one of the largest greenstone belts in the world with historic production of 160 million ounces of gold. The Abitibi consists of a complex and diverse array of volcanic, sedimentary and plutonic rocks typically metamorphosed to greenschist facies grade, but locally attaining amphibolite facies grade. Volcanic rocks range in composition from rhyolitic to komatiitic and commonly occur as mafic to felsic volcanic cycles. Sedimentary rocks consist of both chemical and clastic varieties and occur as both intravolcanic sequences and as unconformably overlying sequences. A wide spectrum of mafic to felsic, pre-tectonic, syn-tectonic and post-tectonic intrusive rocks are present. All lithologies are cut by late, generally northeast-trending proterozoic diabase dikes.

Most of the gold mineralization at Young-Davidson is associated with a syenite intrusive rock. Within this syenite, gold mineralization is associated with a stockwork of quartz veinlets and narrow quartz veins, rarely greater than a few centimetres thick, that are within a broader halo of disseminated pyrite and potassic alteration. Mineralization is known to extend beyond 1,500 metres below surface and the orebody remains open at depth.

Young-Davidson has been designed and constructed as a highly productive, bulk tonnage underground mining operation supporting low-cost gold production. The underground mine is accessed via two shafts and a ramp system to a depth of 1,500 metres. The operation utilizes large modern equipment, high productivity bulk mining methods (long hole open stoping), and paste backfill. Scooptrams load, haul and transfer stope production to the ore pass system from where it is hoisted to the surface with minimal ore and waste re-handling.

Young-Davidson has been undergoing a multi-year expansion of the lower mine which is expected to be completed in 2020. During the first half of 2020, the operation will transition to newly constructed lower mine infrastructure which is larger, highly automated and more productive. The lower mine infrastructure is designed to operate at 8,000 tonnes per day (“tpd”) and will replace the existing mid-mine infrastructure which is designed for 6,000 tpd. The transition to the lower mine infrastructure is expected to drive gold production higher and costs lower starting in the second half of 2020.

Ore is processed through an 8,000 tpd single stage semi-autogenous grinding circuit followed by flotation. The flotation concentrate is further ground and leached in a carbon-in-leach (CIL) circuit. The flotation tailings are also leached in a CIL circuit. Gold is recovered from the carbon followed by electro-winning and pouring of doré bars. The Young-Davidson carbon-in-leach tailings are treated with the SO2/Air cyanide destruction method.