Island Gold Mine: 2017 Delineation Drilling Program Highlights
In 2017, delineation drilling will focus on three main objectives as highlighted below:
- Complete the delineation to upgrade the remaining resources located within the PEA area, primarily in the fourth mining horizon, between the 785 and the 1,000 metre levels.
- Further test the down plunge extension of the main C Zone at depth, below the 1,000 metre level where a new resource block was identified as part of the 2016 program. Drilling will be completed from the main ramp and from a new exploration drift that will be established on the 860 metre level.
- Further test the eastern lateral extension area located 300 metres east of the main deposit where two new inferred resources blocks were identified. Drilling will be completed from the 340 metre level and from an extension of the 620 metre level exploration drift that will be completed in 2017.
Island Gold: 2017 Exploration Drilling Program Highlights
In 2017, the Phase 2 exploration program will continue drilling in two key target areas, as highlighted below:
- The deep directional exploration drilling program will continue in 2017, targeting the area between the 1,000 and 1,500 metre levels, east and west of the new resource block.
- The eastern lateral exploration drilling program will continue to target additional resources east of the main PEA area, where new resource blocks were identified as part of the 2016 drilling program.
- Richmont expects to provide an update of the Island Gold Phase 2 exploration drilling program in the latter part of February.
Beaufor Mine Mineral Reserves and Resources (December 31, 2016)
|
|
Mineral Reserves and Resources
|
|
December 31, 2016
|
December 31, 2015
|
|
Beaufor Mine
|
Tonnes
(MT)
|
Grade
(g/t)
|
Gold
Ounces
(000's)
|
Tonnes
(MT)
|
Grade
(g/t)
|
Gold
Ounces
(000's)
|
|
Proven & Probable Reserves
|
0.20
|
6.86
|
45.0
|
0.30
|
6.57
|
63.9
|
|
Measured & Indicated Resources
|
0.35
|
7.37
|
83.7
|
0.84
|
6.34
|
171.9
|
|
Inferred Resources
|
0.04
|
6.44
|
7.5
|
0.14
|
6.44
|
28.0
|
|
Notes to Mineral Reserves and Resources:
Mineral Resources presented are exclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
|
Beaufor Mine: Key Assumptions
- For the 2016 Mineral Reserve and Mineral Resource estimates, a metal price of CAD$1,500 per ounce of gold was used. The cut-off grades have decreased slightly over 2015 to a range of 4.14 to 5.63 g/t in 2016 (4.31 to 6.04 g/t gold in 2015).
- Mineral Reserves and Mineral Resources were estimated using a polygonal method. A density of 2.75 t/m3 was used to calculate tonnages.
- A capping value of 68 g/t was maintained for high grade gold values.
- For Mineral Reserves, the dilution estimates were maintained at 10% for long hole areas and 5% for room and pillar areas.
Beaufor Mine: 2016 Mineral Reserve and Resource Highlights
At the Beaufor Mine, 2016 Mineral Reserves and Resources decreased as 2016 delineation and exploration drilling was unable to offset mining depletion and converted resources. Additionally, following a reassessment of all resource blocks, certain low-grade, uneconomic resource blocks located in the upper part of the mine were removed.
- Mineral reserves of 44,920 gold ounces (net of depletion), a 30% decrease over 2015, at a 4% higher grade of 6.86 g/t.
- Inferred resources of 7,500 gold ounces at a consistent grade of 6.44 g/t.
- Measured & Indicated resources decreased to 83,700 ounces at an increased grade of 7.37 g/t. The decrease in ounces was due to the exclusion of low-grade and uneconomic resource blocks located in the upper part of the mine.
Beaufor Mine: 2017 Delineation and Exploration Program Highlights
- 2017 delineation drilling will focus on extending the reserve blocks inside the Q Zone, both at depth and laterally.
- Exploration drilling will focus on identifying potential new veins in the vicinity of the known reserves and resources. Drilling will also focus on testing the expansion potential of the higher grade Q Zone at depth.
Qualified Persons
The Corporation completed its 2016 year-end Mineral Reserve and Mineral Resource estimates for the Island Gold and Beaufor Mines internally with Roscoe Postle Associates Inc. (RPA) subsequently completing a review and audit of the Island Gold Mineral Reserve and Resource estimates.
Daniel Adam, Vice-President, Exploration for Richmont Mines has reviewed the scientific and technical information contained within this press release and serves as the Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101").
About Richmont Mines Inc.
Richmont currently produces gold from the Island Gold Mine in Ontario, and the Beaufor Mine in Quebec. The Corporation is also advancing development of the significant high-grade resource extension at depth of the Island Gold Mine in Ontario. With 25 years of experience in gold production, exploration and development, and prudent financial management, the Corporation is well-positioned to cost-effectively build its Canadian reserve base and to successfully enter its next phase of growth.
Forward-Looking Statements
This news release contains forward-looking statements that include risks and uncertainties. When used in this news release, the words "estimate", "project", "anticipate", "expect", "intend", "believe", "hope", "may", "objective" and similar expressions, as well as "will", "shall" and other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current expectations and apply only as of the date on which they were made. Except as may be required by law or regulation, the Corporation undertakes no obligation and disclaims any responsibility to publicly update or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise.
The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include, without limitation, the impact of the 2016 Mineral Reserves and Resources estimates, the ability to increase production utilizing the current ramp system, the capital requirements to increase milling capacity, changes in the prevailing price of gold, the Canadian-United States exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations and the failure of our exploration drilling programs to identify significant new resources or targets or expand existing resources could also affect the results. Other risks are set out in Richmont's Annual Information Form, Annual Reports and periodic reports. The forward-looking information contained herein is made as of the date of this news release.
Cautionary note to US investors concerning resource estimates
Information in this press release is intended to comply with the requirements of the Toronto Stock Exchange and applicable Canadian securities legislation, which differ in certain respects with the rules and regulations promulgated under the United States Securities Exchange Act of 1934, as amended ("Exchange Act"), as promulgated by the SEC. The requirements of NI 43-101 adopted by the Canadian Securities Administrators differ significantly from the requirements of the United States Securities and Exchange Commission (the "SEC").
U.S. Investors are urged to consider the disclosure in our annual report on Form 20-F, File No. 001-14598, as filed with the SEC under the Exchange Act, which may be obtained from us (without cost) or from the SEC's web site: http://sec.gov/edgar.shtml.
Qualified Persons
The Mineral Reserve and Resource estimates as of December 31, 2016 and December 31, 2015 were performed by qualified persons as defined by NI 43-101 and were supervised by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc. Please refer to the SEDAR website (www.sedar.com) for full reports and additional corporate documentation.
The Island Gold Mine Reserve and Resource estimate as of December 31, 2016 was performed by M. Raynald Vincent P.Eng. M.P.M., Chief Geologist, and M. Léon Grondin Leblanc, P.Eng., Chief Engineer, both employees of Richmont Mines Inc., and Qualified Persons as defined by NI 43-101. A NI 43-101 technical report will be completed for the Island Gold Mine as of December 31, 2016, and will be filed on SEDAR within 45 days.
The Beaufor Mine Reserve and Resource estimate as of December 31, 2016 was performed under the supervision of Bernard Salmon, P Eng., Manager, Resources and Project Evaluation and M. Louis Nkoy, P.Eng., Chief Engineer, both employees of Richmont Mines Inc., and qualified persons as defined by NI 43-101.
The Reserve and Resource estimates of Beaufor and Island Gold mines were prepared using a gold price of CAD$1,500 per ounce for 2016. The resource estimate of the Francoeur Mine was established at the end of 2012 using a gold price of US$1,450 (CAD$1,450) per ounce, and was prepared by qualified persons as defined by NI 43-101 and was supervised by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc. The resource estimate of the Wasamac property was established at the end of 2012 using a gold price of US$1,450 (CAD$1,450) per ounce. It was supervised by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc., and a Qualified Person as defined by NI 43-101. The Monique Resource estimate as of December 31, 2013 was prepared using a gold price of US$1,225 (CAD$1,300) per ounce and was supervised by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc., and a Qualified Person as defined by NI 43-101.
2016 Mineral Reserves and Resources1
|
|
December 31, 2016
|
December 31, 2015
|
|
Tonnes
(metric)
|
Grade (g/t Au)
|
Ounces
of gold
|
Tonnes
(metric)
|
Grade
(g/t Au)
|
Ounces
of gold
|
|
ISLAND GOLD MINE
|
|
|
|
|
|
|
|
Proven Reserves2
|
573,000
|
8.68
|
159,800
|
363,500
|
7.53
|
87,900
|
|
Probable Reserves2
|
1,978,000
|
9.31
|
592,400
|
1,752,000
|
8.41
|
473,800
|
|
Total Proven & Probable Reserves2
|
2,551,000
|
9.17
|
752,200
|
2,115,500
|
8.26
|
561,700
|
|
Measured Resources
|
33,500
|
4.94
|
5,350
|
7,500
|
5.80
|
1,350
|
|
Indicated Resources
|
445,500
|
6.01
|
86,100
|
341,000
|
6.42
|
70,350
|
|
Total Measured & Indicated Resources
|
479,000
|
5.94
|
91,450
|
348,500
|
6.40
|
71,700
|
|
Total Inferred Resources
|
3,042,000
|
10.18
|
995,700
|
2,815,000
|
8.49
|
768,050
|
|
BEAUFOR MINE
|
|
|
|
|
|
|
|
Proven Reserves2
|
32,000
|
6.77
|
7,010
|
35,600
|
7.31
|
8,350
|
|
Probable Reserves2
|
171,500
|
6.87
|
37,910
|
266,500
|
6.48
|
55,500
|
|
Total Proven & Probable Reserves2
|
203,500
|
6.86
|
44,920
|
302,100
|
6.57
|
63,850
|
|
Measured Resources
|
53,000
|
6.27
|
10,700
|
109,000
|
5.32
|
18,600
|
|
Indicated Resources
|
300,000
|
7.57
|
73,000
|
734,000
|
6.50
|
153,300
|
|
Total Measured & Indicated Resources
|
353,000
|
7.37
|
83,700
|
843,000
|
6.34
|
171,900
|
|
Total Inferred Resources
|
36,000
|
6.44
|
7,500
|
135,000
|
6.44
|
28,000
|
|
MONIQUE PROPERTY4
|
|
|
|
|
|
|
|
Indicated Resources
|
107,500
|
4.88
|
16,850
|
107,500
|
4.88
|
16,850
|
|
WASAMAC GOLD PROPERTY3
|
|
|
|
|
|
|
|
Measured Resources
|
3,124,500
|
2.75
|
276,550
|
3,124,500
|
2.75
|
276,550
|
|
Indicated Resources
|
12,127,000
|
2.89
|
1,125,700
|
12,127,000
|
2.89
|
1,125,700
|
|
Total Measured & Indicated Resources
|
15,251,500
|
2.86
|
1,402,250
|
15,251,500
|
2.86
|
1,402,250
|
|
Total Inferred Resources
|
18,759,000
|
2.66
|
1,605,400
|
18,759,000
|
2.66
|
1,605,400
|
|
FRANCOEUR GOLD PROPERTY5
|
|
|
|
|
|
|
|
Measured Resources
|
-
|
-
|
-
|
40,000
|
5.89
|
7,600
|
|
Indicated Resources
|
-
|
-
|
-
|
280,000
|
6.55
|
59,000
|
|
Total Measured & Indicated Resources
|
-
|
-
|
-
|
320,000
|
6.47
|
66,600
|
|
Total Inferred Resources
|
-
|
-
|
-
|
18,000
|
7.17
|
4,150
|
|
TOTAL RESERVES AND RESOURCES
|
|
|
|
|
|
|
|
Proven & Probable Reserves
|
2,754,500
|
9.00
|
797,120
|
2,417,600
|
8.05
|
625,550
|
|
Measured & Indicated Resources
|
16,191,000
|
3.06
|
1,594,250
|
16,870,500
|
3.19
|
1,729,300
|
|
Inferred Resources
|
21,837,000
|
3.72
|
2,608,600
|
21,727,000
|
3.44
|
2,405,600
|
|
1 Mineral Resources presented are exclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
|
|
2 In 2016, based on a gold price of CAN$1,500/oz; in 2015, based on a gold price of US$1,080/oz and an exchange rate of CAN$1.2037 = US$1.00.
|
|
3 Underground Mineral Resources established as of December 31, 2012.
|
|
4 Monique Mineral Resources are located underground directly below the open-pit.
|
|
5 The Francoeur Mine closed in November 2012 and was sold in 2016.
|
SOURCE Richmont Mines
Renaud Adams, President and CEO, Phone: 416 368-0291 ext. 101; Anne Day, Vice-President, Investor Relations, Phone: 416 368-0291 ext. 105